Quantcast
Channel: Top Story – Downbeach BUZZ
Viewing all articles
Browse latest Browse all 2663

Glenn Klotz Talks Margate Dune, Beach and Outfall Deal for 2018

$
0
0


Listen to Podcast: It’s not over yet. In some ways..the Margate Beach & Dune fun has just begun. Will a new outfall beach drainage project affect the summer of 2018?

We talk to long time Margate resident & dune guru, Glenn Klotz. We dig into that deal with the devil, reluctantly signed on OCT 19 by the Margate Commissioners.

Glenn Klotz: Margate Citizens Questioning the Dune Project

Approving another beach & dune construction project on this part of Absecon island.

glenn klotz dune deal 10.24.17

This episode of the ACprimetime Radio Podcast is sponsored by APEX PRIME Realty. Setting a new standard for commercial & residential real estates industry along the South Jersey Shore. Reach out to Sherri Lilienfeld. Visit APEXPRIME.com

The NJ DEP & The Army Corp of Engineers will soon rip up the entire length of margate beaches, to install a full blown network of outfall drainage pipes.

The Army Corps will pay 100% of the cost…but Margate will take responsibility for maintenance & upkeep moving forward.

  • As a deal sweetener, a deal with the devil….margate wont be forced to get regular renourishments….every few years….pumping sand on the heach.
  • But with a dune cutting the heach in half….and erosion chewing up the front beach, margate will likely still need renourishment in the near future.
  • Did Margate leadership do everything possible to defend the rights of local margatians?
  • Does the Army corp get paid based on cubit ft of sand pumped? Not on the effectiveness of the project?

Glenn Klotz… Margate Citizens Question the Dune Project

The post Glenn Klotz Talks Margate Dune, Beach and Outfall Deal for 2018 appeared first on Downbeach BUZZ.


Viewing all articles
Browse latest Browse all 2663

Trending Articles